Blasting requirements:
(1) When blasting methods will be used or when blasting is anticipated, a detailed plan of excavating, shoring, blasting and backfilling procedures shall be submitted at least 15 days prior to blasting.
(2) No predrilling or blasting may be performed within the right-of-way unless authorized by the permit and until the permittee provides insurance for property damage and public liability.
(3) The blaster’s license number shall be furnished.
Construction will be a violation of the noise ordinance if completed during 10:00 p.m. and 6:00 a.m. Operating or permitting the operation of any tools or equipment used in construction operations, drilling or demolition in a manner as to cause a noise disturbance across a property boundary.